ACCOMPLISHED PROJECTS

Construction of East Corridor P011 (Package2)

Client’s name: ASHGHAL

Main Contractor: China Harbour Engineering Company Ltd.

Start Date: June 26, 2016

Finish Date: May 27, 2017

Quantity LM: 1000

Dukhan Highway Project

Client’s name: ASHGHAL

Main Contractor: Consolidated Contractors Group S.A.L. (Offshore CCC) / Teyseer Contracting company JV.

Start Date: September 1, 2015

Finish Date: October 27, 2015

Quantity LM: 192

Dukhan Highway Project

Client’s name: ASHGHAL

Main Contractor: Consolidated Contractors Group S.A.L. (Offshore CCC) / Teyseer Contracting company JV.

Start Date: January 30, 2016

Finish Date: August 22, 2016

Quantity LM: 2,000

Road & Infrastructure Wakra West MMUP (PH2, PKG14)

Client’s name: ASHGHAL

Main Contractor: LANE-SOLID-TADMUR JV

Start Date: November 27, 2016

Finish Date: December 20, 2016

Quantity LM: 400

GTC-614-2013

Client’s name: KAHRAMAA

Main Contractor: Al Bawakir Unicon

Start Date: July 3, 2016

Finish Date: July 29, 2016

Quantity LM: 300

North Road Corridor

Client’s name: ASHGHAL

Main Contractor: TEKFEN Construction.

Start Date: January 20, 2016

Finish Date: March 5, 2016

Quantity LM: 300

7744-FLOWLINE-DUKHAN

Client’s name: Qatar Petroleum

Main Contractor: Gulfar Al Misnad Engineering and Contracting company

Start Date: May 3, 2016

Finish Date: May 5, 2016

Quantity LM: 120

Extension of Distribution Network at Doha and Vicinity - Phase 5 (Package A)

Client’s name: KAHRAMAA

Main Contractor: Qatar Arab Contractors Company (QAC).

Start Date: May 1, 2015

Finish Date: August 15, 2015

Quantity LM: 1,700

Road Crossings at QP Dukhan Fields

Client’s name: Qatar Petroleum

Main Contractor: FAL Telecommunication.

Start Date: July 2, 2016

Finish Date: July 8, 2016

Quantity LM: 130

Construction of CP08-A-03 Enabling Works - Qetaifan Islands

Client’s name: Lusail Real Estate Development Company

Main Contractor: Al Jaber Engineering.

Start Date: November 21, 2015

Finish Date: January 31, 2016

Quantity LM: 1,900

Red Line South Metro

Client’s name: Qatar Rail

Main Contractor: Red Line South JV.

Start Date: February 27, 2016

Finish Date: March 5, 2016

Quantity LM: 400

GTC-593/2013 Call of Contract for 11KV reinstatement work for KAHRAMAA

Client’s name: KAHRAMAA

Main Contractor: Q TEC’ Engineering.

Start Date: July 19, 2015

Finish Date: October 15,2015

Quantity LM: 2,000

GTC-554/2013 Call of Contract for 11KV reinstatement work for KAHRAMAA

Client’s name: KAHRAMAA

Main Contractor: Al-Ajjaj Limited Company (AALCO).

Start Date: July 11, 2015

Finish Date: November 25, 2015

Quantity LM: 2,000

GTC-586/2013 Call of Contract for Electricity Distribution Network for KAHRAMAA

Client’s name: KAHRAMAA

Main Contractor: Al-Ajjaj Limited Company (AALCO).

Start Date: August 16, 2015

Finish Date: September 2, 2015

Quantity LM: 500

GTC-666/14 Call of Contract for Electricity Distribution Network (Scheme) for KAHRAMAA

Client’s name: KAHRAMAA

Main Contractor: Al-Ajjaj Limited Company (AALCO).

Start Date: May 15, 2016

Finish Date: June 22, 2016

Quantity LM: 500

GTC-566/2013 & GTC-628/2014

Client’s name: KAHRAMAA

Main Contractor: Al-Ajjaj Limited Company (AALCO).

Start Date: December 21, 2016

Finish Date: December 29, 2016

Quantity LM: 150

Maintenance Works For QP

Client’s name: Qatar Petroleum

Main Contractor: Al Mohanna Trading & Contracting.

Start Date: August 17, 2016

Finish Date: August 20, 2016

Quantity LM: 57

Al Khalij Cement, External Works

Client’s name: Al Khalij Cement

Main Contractor: Spacemaker (A Subsidiary of Gulf Contracting Co.).

Start Date: July 4, 2016

Finish Date: July 20, 2016

Quantity LM: 80

Qatar Chlorine Substation

Client’s name: Qatar Chlorine

Main Contractor: Power Links Qatar.

Start Date: June 10, 2016

Finish Date: July 5, 2016

Quantity LM: 400

Wakra Stadium (Enabling Works)

Client’s name: Supreme Committee

Main Contractor: Al Bawakir Unicon.

Start Date: September 26, 2016

Finish Date: October 2, 2016

Quantity LM: 100

2500m3/day sea water Desalination Plant

Client’s name: Qatar Petroleum

Main Contractor: PROTEC Technical Services

Start Date: May 10, 2016

Finish Date: July 5, 2016

Quantity LM: 1,500

8857-KAHARAMAA

Client’s name: Qatar Petroleum / KAHARAMAA

Main Contractor: Gulfar Al Misnad Engineering and Contracting company.

Start Date: May 4, 2016

Finish Date: May 5, 2016

Quantity LM: 180

8-859-00-QNC-CO

Client’s name: Qatar Petroleum

Main Contractor: Gulfar Al Misnad Engineering and Contracting company.

Start Date: February 1, 2016

Finish Date: February 6, 2016

Quantity LM: 210

GTC-619/2013 & GTC620/2013 Call of Contract for KAHRAMAA

Client’s name: KAHRAMAA

Main Contractor: Mirrikh Contracting Company.

Start Date: September 7, 2015

Finish Date: April 6, 2016

Quantity LM: 1,500

Qatar Power Transmission System Expansion Phase - 11

Client’s name: KAHRAMAA

Main Contractor: ETA Star International.

Start Date: January 16, 2017

Finish Date: August 5, 2017

Quantity LM: 300

Al Wakrah Bypass Road (P015)

Client’s name: ASHGHAL

Main Contractor: Larsen & Toubro Limited.

Start Date: April 17, 2017

Finish Date: July 15, 2017

Quantity LM:  1,500

Qatar Power Transmission System Expansion ph 13 Substation Packages.

Excavation and Disposal of Excavated Materials for the following Substations:

Mashaf Substation , Wukair Substation , Al Saad Substation , Rawadat Al Egdim Sunstation , Al Faroosh Substation , KTS (Khalifa Town South) Substations , Sailiya Camp-1 Substation , Naeeja-2 Substation

Client’s name: Kahramaa

Main Contractor: Larsen & Tubro Limited

Start Date: June 3, 2018

Finish Date: November 5, 2019

Quantity M³56,377

Al Sheryan-2

Client’s name: Ministry of Interior

Main Contractor: Al Baud Technology Co

Start Date: September 25, 2016

Finish Date: March 7, 2019

Quantity LM: 2,435.50

GTC-707/14 Call of Contract for Electricity Distribution Network for KAHRAMAA

Client’s name: KAHRAMAA

Main Contractor: Al-Ajjaj Limited Company (AALCO)

Start Date: January 3, 2017

Finish Date: August 20, 2018

Quantity LM: 544

Red Line South Underground

Client’s name: Qatar Rail

Main Contractor: QDVC-GS E & C – ADE JV

Start Date: July 7, 2018

Finish Date: Janury 5, 2019

Quantity LM: 470

Doha Metro Green Line

Client’s name:Qatar Rail

Main Contractor: Fujita Corporation

Start Date: November 11, 2018

Finish Date: December 23, 2018

Quantity LM: 138

Al Rayyan Stadium SC2022 Support Works DN110 - Package 06

Client’s name: ASHGHAL

Main Contractor: Al Jaber Engineering

Start Date: December 3, 2018

Finish Date: July 25, 2019

Quantity LM: 184

Flood Prevention Scheme in Ain Khaled Phase-2, Package-3

Client’s name: ASHGHAL

Main Contractor: Petroserv Limited

Start Date: FEBRUARY 3, 2019

Finish Date: March 19, 2019

Quantity LM: 448

Road Improvement Of Immigration Interchange Roundabout and 22nd

Client’s name: ASHGHAL

Main Contractor: UCC/Infraroad JV

Start Date: March 6, 2019

Finish Date: October 10, 2019

Quantity LM: 160

Roads & infrastructure for Government Residential Division in South of Wukair Project (QS036 - P01)

Client’s name: ASHGHAL

Main Contractor: UCC/Infraroad JV

Start Date: March 20, 2019

Finish Date: April 2, 2019

Quantity LM: 110

KAHRAMAA GTC-746/2015

Client’s name: Kahramaa

Main Contractor: Strom Constuction LLC

Start Date: April 6, 2019

Finish Date: April 10, 2019

Quantity LM: 59.70

Construction of Foul Sewer Within Doha South - Package-1

Client’s name: ASHGHAL

Main Contractor:Al Waha Contracting and Trading Co.

Start Date: April 15, 2019

Finish Date: April 17, 2019

Quantity LM: 40

Al Wukeir Emergency Works

Client’s name: ASHGHAL

Main Contractor:METITO Overseas Qatar

Start Date: June 12, 2019

Finish Date: June 15, 2019

Quantity LM: 40

GTC-666/14 LOT 2

Client’s name: KAHRAMAA

Main Contractor:Netweork Electrical & Mechanical Cont. Co. W.L.L.

Start Date: June 23, 2019

Finish Date: September 3, 2019

Quantity LM: 230

AL BUSTAN NORTH STREET – P007 C7 P2

Client’s name: ASHGHAL

Main Contractor: Consolidated Contractors Group S.A.L. (Offshore CCC) / Teyseer Contracting company JV

Start Date: January 17, 2018

Finish Date: February 16, 2020

Quantity LM: 9,570

Red Line North Elevated at Grade - Lusail City

Client’s name: Qatar Rail

Main Contractor: REDCO International

Start Date: April 27, 2019

Finish Date: June 30, 2019

Quantity LM: 335.55

GTC-736A/2015 - Power Transmission System Expansion - Phase 13 (Umm Garn & KTS)

Client’s name: KAHRAMAA

Main Contractor: Larsen & Toubro Limited

Start Date: July 3, 2019

Finish Date: December 29, 2019

Quantity LM: 282.00

GTC-691/14 Call of Contract for Electricity Distribution Network for KAHRAMAA

Client’s name: KAHRAMAA

Main Contractor: Al-Ajjaj Limited Company (AALCO)

Start Date: April 9, 2017

Finish Date: April 1, 2018

Quantity LM: 190.48

GTC 628/2014 Call of Contract for Electricity Distribution Network (Scheme) for KAHRAMAA

Client’s name: KAHRAMAA

Main Contractor: Al-Ajjaj Limited Company (AALCO)

Start Date: April 3, 2017

Finish Date: April 3, 2017

Quantity LM: 20.00

Construction of Duhail Intersection and Al Gharrafa Street (P007 C7 P1)

Client’s name: ASHGHAL

Main Contractor: UCC/Infraroad JV

Start Date: October 17, 2019

Finish Date: October 17, 2019

Quantity LM: 64.00

South Al Meshaf Roads & Infrastructure Development Project

Client’s name: ASHGHAL

Main Contractor: Sacyr Engineering and Infrastructures – Medgulf Construction Co. WLL Joint Venture

Start Date: December 1, 2019

Finish Date: January 19, 2020

Quantity LM: 280.00

Umm Al Dome Improvement

Client’s name: ASHGHAL

Main Contractor:Petroserv Limited – Strukton Construction & Trading JV

Start Date: January 16, 2019

Finish Date: November 20,  2020

Quantity LM: 446.93

GTC-917/2018- New 132 kV RAF-1 Substation & Associated works for the Replacement of RAF-A 132kV Switchyard

Client’s name: KAHRAMAA

Main Contractor: Larsen & Toubro Limited

Start Date: July 4, 2019

Finish Date: July 27,  2019

Quantity LM: 307.50

Framework Agreement for CALL-OFF Contracts for Landscaping, Irrigation and Ancillary Works

Client’s name: ASHGHAL

Main Contractor: Palmera Landscape

Start Date: June 11, 2020

Finish Date: June 17, 2020

Quantity LM: 110.00

Roads & Infrastructure in Jeryan Nejaima

Client’s name: ASHGHAL

Main Contractor: Petroserv Limited

Start Date: August 5, 2020

Finish Date: August 30, 2020

Quantity LM: 138.08

IMG_5828

Qatar Power Transmission System Expansion Phase-13

Excavation and Disposal of Soil - DNS site

Client’s name: KAHRAMAA

Main Contractor: Larsen & Toubro Limited

Start Date: June 24, 2020

Finish Date: November 23, 2020

Quantity M3: 8201.00

RIW in Northern Areas - Phase 04 Proposed Access Road Surrounding Immigration HQ in Wadi Al Banat (Project Code IA 2019 C 044 I)

Client’s name: ASHGHAL

Main Contractor: Al-Mohannadi for Roads Trading & Contracting

Start Date: July 14, 2020

Finish Date: September 25, 2020

Quantity LM: 153.27

ME-QA-UGC-PH13 - EHV HV Cables - Cable Package-3 - Trench Excavation for Section 7/F2 for 132kv Themaid- Rawdat Egdim 2 cable route

Client’s name: KAHRAMAA

Main Contractor: Larsen & Toubro Limited

Start Date: November 20, 2020

Finish Date: December 31, 2020

Quantity M:1,203

Central Doha and Corniche Beautification Project Package-4 – (PA 2019 C 111)

Client’s name:  ASHGHAL 

Main Contractor:UCC/Infraroad JV 

Start Date:June 30, 2021 

Finish Date:July 6, 2021 

Quantity LM:62 

 

Qatar Power Transmission System Expansion – Phase13– EHV & HV Cables - Milestones C14-M1 (Gharafa S/S and KTS 1 S/S)

Client’s name: KAHRAMAA

Main Contractor: Larsen & Toubro Limited

Start Date: October 17, 2020

Finish Date: June 1 ,2021

Quantity LM: 167.40

Design and Build of Landscaping for Interchanges in Orbital Road - Project ID : PA 2020 C 015 I

Excavation of Tree Pits

Client’s name: ASHGHAL

Main Contractor: Al Nakheel Agriculture & Trading WLL

Start Date: May 22, 2021

Finish Date: September 28 , 2021

Quantity : 2,000 Pits

Design and Build of Landscaping for Interchanges in Orbital Road - Project ID : PA 2020 C 015 I - Mainline Excavation

Client’s name: ASHGHAL

Main Contractor: Al Nakheel Agriculture & Trading WLL.

Start Date: August 7, 2021 

Finish Date: September 28 , 2021

Quantity LM: 9,500

Design and Build of Landscaping for Interchanges in Orbital Road - Project ID : PA 2020 C 015 I - Chamber Excavation

Client’s name: ASHGHAL

Main Contractor: Al Nakheel Agriculture & Trading WLL.

Start Date: June 25, 2021

Finish Date: September 28 , 2021

Quantity : 30 Nos.

Qatar Power Transmission System Expansion for Phase-13 Substations – Excavation of Al Wakra-4 Substation.

Client’s name: KAHRAMAA

Main Contractor: Larsen & Toubro Limited

Start Date: February 22, 2021

Finish Date: November 4, 2021

Quantity M3: 7,500

NOH2-New Orbital Highway & Truck Route, Contract: C2 Salwa Road to North Relief Road

Client’s name: ASHGHAL

Main Contractor: QDVC Bin Omran JV

Start Date: March 23, 2017

Finish Date: Janury 4, 2022

Quantity LM: 5,148

Interim Road Improvement - Doha South Phase 1

Client’s name: ASHGHAL

Main Contractor: Alghanim International Qatar

Start Date: October 21, 2020

Finish Date: October 12,2021

Quantity LM: 864.41

Phase 13- RAK-SALWA, NDA-WADI OA-OA2 ROUTES EXCAVTION OF ENTRY PIT AND EXIT PIT

Client’s name: KAHRAMAA

Main Contractor: Larsen & Toubro Limited

Start Date: February15, 2021

Finish Date: November 22, 2021

Quantity M3: 1,134

Qatar Power Transmission System Expansion – Phase13– EHV & HV Cables – Milestones C13-M1 (Rawdat Al Khail S/S and Salwa Road S/S)

Client’s name: KAHRAMAA

Main Contractor: Larsen & Toubro Limited

Start Date: April 5, 2021

Finish Date: November 22, 2021

Quantity LM: 440

Qatar Power Transmission System Expansion for Phase-13 Substations - RAAS & JJS Substations

Client’s name: KAHRAMAA

Main Contractor: Larsen & Toubro Limited

Start Date: May 27, 2021

Finish Date: September 8,2021

Quantity M3: 2,500

GTC954 – 400kV CLR Series project (ANS & LZS sites) Excavation.

Client’s name: KAHRAMAA

Main Contractor: Larsen & Toubro Limited

Start Date:  September 7,2021

Finish Date: May 1,2022

Quantity M3: 22,960

Qatar Power Transmission System Expansion for Facility E-Power Evacuation - Al BAHARA Substation. (GTC-956B/2019).

Client’s name: KAHRAMAA

Main Contractor: Larsen & Toubro Limited

Start Date: February 22, 2021

Finish Date: March 31, 2021

Quantity M3: 21,320

IMG_5828

Cycle Way Gaps

Client’s name: ASHGHAL

Main Contractor: Palmera Landscape

Start Date: September 19, 2021

Finish Date: ONovember 24, 2021

Quantity LM: 500

Al Khalij Cement Company

Client’s name: Al Khalij Cement

Main Contractor: SERVTECH International

Start Date: Jun 27, 2017

Finish Date: Jun 28, 2017

Quantity LM: 16

PJ028-D & B Lusail (Al Dayyan Area)

Client’s name: Private Engineering Office

Main Contractor: UCC/Infraroad JV

Start Date: October 2, 2023

Finish Date: October 4, 2023

Quantity LM: 15

Qatar Power Transmission System Expansion – Phase13– EHV & HV Cables – Milestones C14-M6-66kV Cable Line Between Mehairja Super S/S and Maither North 2 S/S

Client’s name: KAHRAMAA

Main Contractor: Larsen & Toubro Limited

Start Date: December 26, 2021

Finish Date: July 4, 2022

Quantity LM: 279.61

North Field East Project Onshore LNG Facilities

Client’s name: QATAR GAS

Main Contractor: METITO Overseas Qatar

Start Date: June 4, 2022

Finish Date: October 26, 2022

Quantity LM: 1,461.00

Qatar Power Transmission System Expansion for Facility-E Power Evacuation - Package S-1 (Substations) & C-5 (EHV/HV Cable Lines) Contract no. GTC/956B/2019

Client’s name: KAHRAMAA

Main Contractor: Larsen & Toubro Limited

Start Date: January 24, 2022

Finish Date: May 8, 2022

Quantity LM: 566.00

LE21M168 - ME-QA-UGC-PH13-EHV HV Cables- Package 9

Client’s name: KAHRAMAA

Main Contractor: Larsen & Toubro Limited

Start Date: March 7, 2022

Finish Date: March 13, 2022

Quantity LM: 60.00

Design and Build (DB) for FIFA Readiness Project 6 (FRP06) for Surface and Ground Water Network at Al Madinat Khalifa and Immigration Underpass Scheme C851/6

Client’s name: ASHGHAL

Main Contractor: Petroserv Limited

Start Date: March 26, 2022

Finish Date: May 31, 2022

Quantity LM: 370.00

Al Khor Expressway Project

Client’s name: ASHGHAL

Main Contractor: TEKFEN Construction

Start Date: March 31, 2022

Finish Date: April 2, 2022

Quantity LM: 43.00

DW016 - P03 - Road & Infrastructure in Al Wajba East Package -3

Client’s name: ASHGHAL

Main Contractor: Gulfar Al Misnad / Tunnels Surf Company

Start Date: May 11, 2022

Finish Date: April 29, 2023

Quantity LM: 256.20

Call - Off Contract (Three Years) for extension of Distribution mains and Services Connections. GTC/762/2015

Client’s name: KAHRAMAA

Main Contractor: Al-Ajjaj Limited Company (AALCO)

Start Date: May 29, 2022

Finish Date: Jun2 7, 2022

Quantity LM: 150.00

Qatar Power Transmission System Expansion - Phase 13 Substations Contract no. GTC/735C/2015 Packages - S1 - S6, S11, S19 & S20

Client’s name: KAHRAMAA

Main Contractor: New Noor Trading and Contracting

Start Date: July 14, 2022

Finish Date: August 22, 2022

Quantity LM: 150.00

ROAD IMPROVEMENT WORKS IN SOUTH OF GREATER DOHA ZONE 90 TO 95 PHASE-7 (SA009 - WO-4)

Client’s name: ASHGHAL

Main Contractor: Al Wakeel Group / TSC

Start Date: August 10, 2022

Finish Date: August 25, 2022

Quantity LM: 100.00

CP13F Fixed and Call off Contract at Lusail City Works

Client’s name: Lusail Real Estate Development Company, Lusail

Main Contractor: AL BALAGH TRADING & CONTRACTING Co. W.L.L.

Start Date: January 14, 2023

Finish Date: February 18, 2023

Quantity LM: 142.00

PA 2022 C 010 G-Upgrading the Surrounding Roads of the Lusail Sports Circuit

Client’s name: ASHGHAL

Main Contractor: International Heavy Equipment (IHE)

Start Date: March 13, 2023

Finish Date: March 22, 2023

Quantity LM: 50.00

Qatar Power Transmission System Expansion – Phase13– EHV & HV Cables – Packages C-5, C-6, C-11, C-12, C-13, C-14, C-15 (GTC/736A/2015)

Client’s name: KAHRAMAA

Main Contractor: Larsen & Toubro Limited

Start Date: May 20, 2023

Finish Date: May 22, 2023

Quantity LM: 30.00

RIW Out of Greater Doha Phase-7 (Sailiyah)

Client’s name: ASHGHAL

Main Contractor: Al-Mohannadi for Roads Trading & Contracting

Start Date: July 29, 2023

Finish Date: September 19, 2023

Quantity LM: 244.35

RIW In Northern Areas - 2021(PA 2021 C 003 G) Al Kabban

Client’s name: ASHGHAL

Main Contractor: Al-Mohannadi for Roads Trading & Contracting

Start Date: August 23, 2023

Finish Date: September 3, 2023

Quantity LM: 64.00

Qatar Power Transmission System Expansion for Facility E-Power Evacuation - Al BAHARA Substation. (GTC-956B/2019).

Client’s name: KAHRAMAA

Main Contractor: Larsen & Toubro Limited

Start Date: February 22, 2021

Finish Date: ON GOING

Quantity M3: 21,320

IMG_5828

Qatar LNF NFXP EPC-2

Client’s name: QATAR GAS

Main Contractor: Samsung C&T Corporation

Start Date: April 8, 2023

Finish Date: May 25, 2024

Quantity LM: 1,235

EPIC for CO2 WAG

Client’s name: Qatar Energy

Main Contractor: Gulfar Al Misnad Engineering and Contracting company

Start Date: July 14, 2023

Finish Date: May 30, 2024

Quantity LM: 3,125

OOREDOO – HDD FOR CIVIL WORKS FOR NEW DEVELOPMENT AREAS

Client’s name: OOREDOO

Main Contractor: Al Kaun Telecoms

Start Date: April 24, 2021

Finish Date: March 21, 2024

Quantity LM: 190

Qatar Power Transmission System Expansion – Phase 13 – EHV & HV Cables Project (Contract No. GTC/736A/2015) & Phase 12- Package C6-GTC/642D/2014

Client’s name: KAHRAMAA

Main Contractor: Doha Intertek Trading & Contracting WLL

Start Date: May 21, 2023

Finish Date: November 21, 2023

Quantity LM: 2,039

TAB-C- 108- Dukhan

Client’s name:QAF

Main Contractor:Al Mqdar for Trading & Contracting

Start Date: December 30, 2023

Finish Date: January 3, 2024

Quantity LM: 74.00